Side by side
| CMEGP (Maharashtra) | PMEGP (Central – KVIC) | |
|---|---|---|
| Maximum project cost | ₹100 lakh manufacturing; ₹50 lakh service and agri-allied | ₹50 lakh manufacturing; ₹20 lakh service |
| Subsidy – general category | 15% urban / 25% rural | 15% urban / 25% rural |
| Subsidy – special category* | 25% urban / 35% rural | 25% urban / 35% rural |
| Rupee caps | Manufacturing ₹7.5 / 12.5 lakh (general), ₹12.5 / 17.5 lakh (special); service ₹3 / 5 lakh (general), ₹5 / 7 lakh (special) | Percentage of project cost within the project limit |
| Own contribution | 10% general, 5% special | 10% general, 5% special |
| Who | Residents of Maharashtra, 18+, new units | 18+, new units; 8th pass for larger projects |
| Apply at | CMEGP portal – District Industries Centre | PMEGP e-portal – KVIC / KVIB / DIC |
*Special category includes women, SC/ST, OBC, minorities, ex-servicemen, divyang, transgender and others as defined in each scheme. Land cost is not part of the project cost.
Step by step
- Choose the activity and check it is not on the scheme's negative list.
- Prepare a bankable project report with realistic sales and cost figures.
- Apply online; the application goes to the district task force for interview / scrutiny.
- The recommended file goes to the bank; the bank appraises and sanctions the loan.
- Training (EDP) where required, then first loan disbursement.
- The bank claims the margin money; it is held as a term deposit and adjusted after about 3 years if the unit is running.
Common questions
Can an existing business get CMEGP or PMEGP?
Only new units. PMEGP has a separate second loan for upgrading units that already took PMEGP or Mudra and repaid well – 15% subsidy on projects up to ₹1 crore (manufacturing) or ₹25 lakh (service).
Is there an upper age limit?
PMEGP needs the applicant to be above 18. Under the CMEGP GR of 21.05.2025 there is no upper age limit.
Is the subsidy paid in cash?
No. The margin money is kept by the bank as a term deposit against your loan (usually for 3 years) and then adjusted against the loan, provided the unit is running.
Can I take both CMEGP and PMEGP?
No – only one of them, and only once.
Sources: CMEGP GR dated 21.05.2025 (effective 01.04.2025); revised PMEGP guidelines and PIB release dated 14.05.2026.